6 ZSK 7 Drilled Reinforced Concrete Slab Clamp

6 ZSK 7 Drilled Reinforced Concrete Slab Clamp
For lifting it is necessary to use at least 4 clamps attached to a 4SK (4STs) sling or a lifting beam. The design of the clamp is rocker type. Cargo: concrete slabs
by request

Drilled reinforced concrete slab clamp. The clamp is convenient to use when moving slabs without eyes. The cargo is fixed by changing the position of the load clamp.

6 ZSK 7 Drilled Reinforced Concrete Slab Clamp
For the operation of the site, we collect cookies, data about the IP address and the location of users. Further use of the site means your consent to the processing of personal data.